Start The Sheetrock | Village Cape CodVillage Cape Cod
Village Cape Cod

Start The Sheetrock

They worked all day Saturday and got a lot of the sheetrock done. We were told that the sheetrock goes up in a couple of days but the mudding and taping is what will take a few weeks to complete. The whole upstairs was completed yesterday and some of the ceilings downstairs. I can now really picture how each of the rooms will look like upstairs and how much space we really have to start figuring out where I want the furniture in each room.

Front Room – Ceiling Sheetrock

Front Room - Ceiling Sheet Rock (2)

Front Room - Ceiling Sheet Rock

Living Room - Ceiling Sheet Rock (2)



Downstairs Bedroom Room (Alexa’s Room) – Ceiling Sheetrock

Downstairs Bedroom - Ceiling Sheet Rock



Downstairs Bathroom – Ceiling Sheetrock

Downstairs Bathroom - Ceiling Sheet Rock



Upstairs Hallway – Sheetrock

Upstairs Hallway - Sheet Rock

Upstairs Hallway - Sheet Rock_1

Upstairs Hallway - Sheet Rock_2

Upstairs Hallway - Sheet Rock_3



Master Bedroom – Sheetrock

Master Bedroom - Sheet Rock (2)

Master Bedroom - Sheet Rock (3)

Master Bedroom - Sheet Rock (4)

Master Bedroom - Sheet Rock



Master Bedroom Bathroom – Sheetrock

Master Bedroom Bath - Sheet Rock (2)

Master Bedroom Bath - Sheet Rock



Bedroom 1 (Baby’s Room) – Sheetrock

Bedroom 1 - Sheet Rock (2)

Bedroom 1 - Sheet Rock (3)

Bedroom 1 - Sheet Rock



Bedroom 1 (Baby’s Room) Bath – Sheetrock

Bedroom 1 Bathroom - Sheet Rock (2)

Bedroom 1 Bathroom - Sheet Rock



Bedroom 1 (Baby’s Room) Closet – Sheetrock

Bedroom 1 Closet - Sheet Rock

Bedroom 1 Closet - Sheet Rock_1



Bedroom 2 (Maren’s Room) Hallway – Sheetrock

Bedroom 2 Hallway- Sheet Rock



Bedroom 2 (Maren’s Room) Bedroom – Sheetrock

Bedroom 2 - Sheet Rock (2)

Bedroom 2 - Sheet Rock



Bedroom 2 (Maren’s Room) Bedroom Bath – Sheetrock

Bedroom 2 Bathroom- Sheet Rock

Bedroom 2 Bathroom- Sheet Rock

Leave a reply