Most of our door hardware is on and it’s looking good. I wasn’t so sure about the pulls we (Jay) picked at first picked out in the kitchen, but I think it fits our style. Our hardwoods are being done all next week, so this was the last scramble to get some of the main items done. Mark, our builder, really pushed to get our tile done in the upstairs so that we can keep on schedule. We also had the electrician in and he finished all of the lighting that we have in so far.


Front Room – Fireplace Prep

If I had my choice I would leave the brick as it is, but due to code we have to tile further out then what it was. Hopefully the tile we selected works well with our colors.
Living Room - Firplace Prep 1

Living Room - Firplace Prep 2


Kitchen – Cabinet Hardware

All of the kitchen cabinet hardware went on. I remember trying to figure out the length of the handles we wanted for each of the doors and drawers and we picked pretty much the same size for all of them throughout.
Kitchen - Cabinet Hardware (2)

Kitchen - Cabinet Hardware (3)

Kitchen - Cabinet Hardware (4)

Kitchen - Cabinet Hardware (5)

Kitchen - Cabinet Hardware


Laundry Room – Cabinet Hardware

All of my hardware and rods for my wrap station went in today. I will probably have to switch out the lower ones to fit my ribbons better, but it’s a start.
Laundry Room - Cabinet Hardware (2)

Laundry Room - Cabinet Hardware (3)

Laundry Room - Cabinet Hardware


Dining Room – Cabinet Hardware

We had the hardware match the kitchen for our dining room. Plus all the glass and shelves are in too. It is slowly all coming together.
Dining Room - Cabinet Hardware 1

Dining Room - Cabinet Hardware


Living Room – Hardwood Repair

Our floors sloped a little in the living room, so they came in and replaced a lot of them to get them ready for the hardware next week.
Living Room - Hardware Floor Redo


Alexa’s Room – Lights Are In

All of Alexa’s lights are up and in. She really wanted to have her chandelier back when we moved out and asked me several times if it would be put back into her room. I also went with an off white pottery barn kids sconce for her vanity area, because all of her furniture is the off white color. Hopefully, I don’t end up regretting this since it’s next to all the white. I will be able to tell better once I get the furniture in with it.
Alexa's Room - Lighting

Alexa's Room - Sconces


Upstairs Hallway – Bookshelves

All of the shelves are in and now they have officially became bookshelves.
Upstairs Hallway - Bookcase Shelving (2)

Upstairs Hallway - Bookcase Shelving (3)

Upstairs Hallway - Bookcase Shelving


Master Bedroom – Sitting Room Sconces

Our sitting room had sconces that we had to come up with. They are a little huge, but I think they will work for now.
Master Bedroom - Sitting Room Sconces


Master Bathroom – Tiling

These guys have been tiling and tiling and tiling in here. Hopefully they get this finished this weekend! They are for sure in the home stretch.
Master Bathroom - Tiling (2)

Master Bathroom - Tiling (5)

Master Bathroom - Tiling (6)

Master Bathroom - Tiling (7)

Master Bathroom - Tiling (8)

Master Bathroom - Tiling (9)

Master Bathroom - Tiling (10)

Master Bathroom - Tiling (11)

Master Bathroom - Tiling (12)

Master Bathroom - Tiling (13)

Master Bathroom - Tiling (14)

Master Bathroom - Tiling


Baby’s Bathroom – Tile Grout Is In

So all of the tile gray grout is done on the baby’s bathroom floors and his bathroom hardware is in.
Baby Boy's - Gray Tile Grout

Baby's Room - Cabinet Hardware


Maren’s Bathroom – Tile

Her tile is close to being done! I can’t wait to see it all grouted.
Maren's Room - Tile (2)

Maren's Room - Tile